Secord Township 5-Year Road Plan
The Secord Township Road Committee met several times to discuss a new
road construction plan for the proposed millage renewal. This final
proposal was presented to the Secord Township Board and approved for
implementation pending acceptance of the 5 (five) year millage proposal
to be voted on May 6, 2008.
After completing the current paving schedule, the committee recommends a
new 3.8 mile paving plan within the township:
1) West Branch Drive— approximately. 7 of a mile South of Lundy to
existing pavement Preparation 2009, Paving 2010
2) Wirtz Road — approximately 1.0 mile
Between Lakeshore Dr. & Three Rivers Rd. Preparation 2010, Paving 2011
3) West Branch Drive—approximately .4 of a mile North of Lundy Lakeshore
Drive - approximately .5 of a mile From existing pavement south of Fire
House Preparation 2011, Paving 2012
4) Pineland Point — approximately. 1 of a mile Whispering Pines Ct.—
approximately. 1 of a mile Whispering Pines Road — approximately .5 of a
mile Preparation 2012, Paving 2013
5) Moose Drive — approximately .3 of a mile Center Road & approximately
.2 mile from Ridge Road south towards Young Preparation 2013, Paving
2014
This plan is based on current costs from Road Commission. The Road
Committee also recommends to the Secord Township Board that the existing
millage renewal be revised for 2.25 % mills (5 years) for new
construction and .75% mills (5 years) for road maintenance. The combined
millage will remain, as current, to the taxpayers.
Additional roads to be considered at end of this proposal: Center Road,
Lakeshore Dr. and Young’s Road.
|